
Solar panels, batteries and EV chargers across Northern Ireland
We design and install them for homes, farms and businesses in all six counties.
- Free survey
- Fixed written quote
- NIE paperwork handled
- Part of the B9 Energy group, based in Larne
Sized for your roof
Every quote includes a generation estimate for your roof's pitch, orientation and shading, so you see what the system should save before you commit.
Priced after a free survey
Surveys are free, and the price is fixed after the survey. All electrical work is carried out and certified by the NICEIC-approved electrical contractors we work with.
Start with a free survey
Answer a few questions about your property and we'll be in touch to arrange the survey.
Illustration
Sized for your roof
Every quote includes a generation estimate for your roof's pitch, orientation and shading, so you see what the system should save before you commit.
Priced after a free survey
Surveys are free, and the price is fixed after the survey. All electrical work is carried out and certified by the NICEIC-approved electrical contractors we work with.
Start with a free survey
Answer a few questions about your property and we'll be in touch to arrange the survey.
From quote to switch-on
- Step 1
Estimate or quote
Postcode and a recent bill.
- Step 2
Free survey
We fix the price.
- Step 3
Install in 1–2 days
Scaffolding included.
- Step 4
Switch on and save
Warranties registered.
How we size your system
Before we visit, we model your roof from satellite imagery and irradiance data for your location. The model covers pitch, orientation and shading from nearby trees and buildings, and we check it at the site survey.
The generation figure on your quote is for your roof and your electricity use, not a UK-wide average.
B9 Renewables is part of the B9 Energy group, from the same Larne base. Photos on this site include B9 group installs on commercial roofs.
We fit solar, batteries and EV chargers for businesses and farms as well as homes. Commercial and farm solar

Case study
Rooftop solar for The Print Factory
A 108-panel, circa 50 kWp daytime-load array on an industrial roof in Enniskillen — designed, grid-approved under G99 and commissioned for a Northern Ireland print works that uses its power when the sun is up.
Typical prices
Common questions
Do you charge for surveys or quotes?
No. Surveys and quotes are free and carry no obligation. We would rather tell you at survey stage that your roof is not suitable than sell you a system that will disappoint.
How long does the whole process take?
Typically four to six weeks from survey to switch-on for a standard home install notified under G98. Systems needing a G99 application to NIE Networks take longer because approval must be granted before connection. NIE Networks aims to issue a connection offer within three months, and works can follow after that.
Where in Northern Ireland do you work?
All six counties. We are based in Larne and cover Belfast, Lisburn, Bangor, Newtownabbey, Carrickfergus, Ballymena, Antrim, Derry~Londonderry, Coleraine, Newry, Craigavon, Omagh, Enniskillen and everywhere in between.
What warranties do I get?
Panels carry a 25-year performance warranty, inverters 10–12 years, and batteries 10 years or a stated cycle count. We register the manufacturer warranties for you and hand over all documentation at commissioning.
Get a quote for your home
Send your postcode and a recent bill. We model your roof first, then survey and give a fixed written price.
- Free survey
- Fixed written quote
- NIE paperwork handled
- Part of the B9 Energy group, based in Larne